Made-up data from a demonstration. Not a client result.
What the acceptance test looks like
Every scope carries a numbered test, and you run it.
Scope · Acceptance test
Weekly report rebuild
-
The weekly report builds from your job export, in tools you own.
Passes when This week’s report sits in your shared drive.
-
Every job in the export appears once in the report.
Passes when The side-by-side check shows no duplicate and no gap.
-
A renamed column stops the run before anything is sent.
Passes when Rename one in a copy and run it.
-
Each run emails you a short status message.
Passes when The message is in your inbox.
-
The off switch stops the workflow and your old way still works.
Passes when Flip it, then make the report the old way.
How acceptance works
- You run the numbered test in the five business days from handover.
- If a line fails, write to us and name its number. One remediation round is included.
- If no written rejection citing a failed numbered criterion arrives in that window, it counts as accepted.